Trevor Parscal's Studio

Building a recording studio in New Hampshire

Clearing & Floor Joists

The last few days I’ve been chipping away getting floor joists up.

The bottom of the 2×8 joists are flush with the bottom of the beam, leaving 8ft 1-1/2″ from unfinished floor to ceiling.

The joist hangers are secured using Simpson SD screws, which are much easier to work with than the hot dipped nails.

We’re also doing some more tree clearing to create a pasture. The equipment they’re using is really big.

This also took care of a few dead trees that were a threat to the studio if they were to fall.

Next Post

Previous Post

© 2020 Trevor Parscal's Studio