Land Grading
October 5, 2020
-
Rafter Sheathing Started
September 16, 2020
-
Attic Wall
September 9, 2020
-
Silencing Rattles
August 29, 2020
-
Rafter Repair
August 23, 2020
-
Structural Bracing Started
August 19, 2020
-
Attic Subfloor & Exterior Vents
August 12, 2020
-
Coat Closet & Attic Stairs
August 11, 2020
-
Mechanical Room Floor Complete
August 9, 2020
-
Work Lighting Electrical Rebuilt
August 7, 2020
-
Headers & Floor Joist Bridging
August 5, 2020
-
Collar Ties & Interior Walls
July 31, 2020
-
Subfloor Complete
July 17, 2020
-
Curves & Transitions
-
Sub-Panel Roughed-In
July 13, 2020
-
Lobby Design Changes
July 12, 2020
-
Center Wall Complete
July 8, 2020
-
Rough-in Planning
July 4, 2020
-
Upper-center Wall Started
July 1, 2020
-
Floor Joists Started
June 24, 2020
-
Spray Foam Insulation
June 22, 2020
-
Floor Beam
June 19, 2020
-
Center Wall Started
June 18, 2020
-
Rafter Blocking
June 15, 2020
-
Rafters Mostly Done
June 13, 2020
-
Plumb Side Walls
June 12, 2020
-
First Rafter
June 11, 2020
-
Ledger Board
June 6, 2020
-
Final Walls & Ridge Beam Up
June 5, 2020
-
Sixth Wall Framed
June 3, 2020
-
Older Posts