Fourth Wall Started
May 28, 2020
The last two evenings I’ve been chipping away at cutting and laying out the fourth wall.

My goal is to have the wall framed and sheared by Saturday morning, when I’ll have some help lifting the wall into place.

This time the hoists will be above the base of the wall instead of the top, making the pull start at a much steeper angle, but and at a shallower one.
- Categories
- Construction