Trevor Parscal's Studio

Building a recording studio in New Hampshire

Floor Beam

Today Peter came by for a little bit to help me get the floor beam onto the center walls.

We attached hoists on each side to the steel rafter directly overhead, which made for a very easy direct vertical lift.

Once up, we nailed it into the vertical boards that stick out the top of the side walls.

Finally, we added some temporary bracing, just to be extra careful.

Next Post

Previous Post

© 2020 Trevor Parscal's Studio

Theme by Anders Norén