September 16, 2022
The last couple weeks have been very busy with getting the drywall installed.
I hired out the labor, but was responsible for all materials.
Partially due to my own inexperience with calculating drywall and partially due to some of the less efficient ways in which they laid out the sheets, I ended up running out of drywall after the first day.
Thanks to Adam, who dropped everything to meet me at Home Depot before it closed with a van that could hold drywall, we were able to get 22 more sheets on site in a couple of hours of being told we needed more.
For them to finish hanging, I ended up having to get another 8 sheets the next day.
After a couple days of plastering things were ready to sand and prime.
Once the primer went on, suddenly the place started looking a lot like the renderings.
The live room ceiling will be all flat black which will make the details much less visible, but I was really glad to see how nice it came out.