Trevor Parscal's Studio

Building a recording studio in New Hampshire

Trenching

One of the things I’ve been putting off for far too long is getting electrical service to the building. For some time now I’ve been using a 10-gauge extension cord to power the lighting and tools in the workshop. What I need is a 200amp panel.

So I finally rented a mini excavator and dug the 40″ deep 150′ long trench, making a mess of our yard in the process.

The excavator also proved quite useful for leveling the garden so we could install some raised beds. Two down, one to go.

Next Post

© 2019 Trevor Parscal's Studio

Theme by Anders Norén