Trevor Parscal's Studio

Building a recording studio in New Hampshire

Ready for Final Grading

Today the grading company came by and took a look. They’re coming tomorrow to slope the grade away from the perimeter of the building and lay a border of stone drip edge to prevent dirt being slashed up onto the building when it rains.

Adam and I took the scaffolding down, moved the remaining debris and vehicles out of the way, and the job-site is now ready for final grading. Also, now that the scaffolding is out of the way, we can install the remaining two doors, finally sealing the building up for the winter.

 

Next Post

Previous Post

© 2017 Trevor Parscal's Studio

Theme by Anders Norén