Dave stayed the night, which gave us some time to work on a new song we’ve been writing. Peter came out around noon and we got working on continuing installing siding.

We had to work around the door, which required a lot of cutting. Adam had loaned me a really amazing tool that cuts through metal very quickly. This proved to be critical to making progress.

As we finished up for the day, we were happy to see a whole wall up. I need to figure out how to ensure the exposed insulation doesn’t get wet before the other walls and the roof are installed.